Client: Rosslee
Project: Our Lady & St Gerard’s
Scope: Full Electrical fit out
Completed: Completed October 2018
Project value: £54,615.00
Project Overview:
Work Carried out
New LED lighting with intelligent control fitted throughout. New general power, Data and Telecoms installation all contained within dado trunking systems. L1 fire detection System fitted throughout along with Intruder alarm and access systems all interfaced with the main school systems. Air conditioning and heat recovery heating and ventilation systems. Bonding Earthing & Testing. Replacement a reconfiguration of existing mains distribution in main school
Key Challenges
Amount of work involved in replacing the existing school mains distribution which had to be carried out during a one-week half term
Added Value:
We delivered an energy efficient electrical fit out through the introduction of LED lighting that brings reduced electricity bills along with a longer maintenance free life span. The project was delivered to the client’s brief on time and of course on budget. The installation was fully tested with NICEIC test certificates supplied as standard along with As Fitted drawings and all relevant maintenance schedules and data sheets in the Operational manuals issued.